4 Security Analyst Performing Bia Analyst Notes Disaster Failover Systems Must Running Wit Q43867657
4. A security analyst is performing a BIA. The analyst notesthat in a disaster, failover systems must be up and running within30 minutes. The failover systems must use back up data that is noolder than one hour. Which of the following should the analystinclude in the business continuity plan?
A. A maximum MTTR of 30 minutes
B. A maximum MTBF of 30 minutes
C. A maximum RTO of 60 minutes
D. An SLA guarantee of 60 minutes
Expert Answer
Answer to 4. A security analyst is performing a BIA. The analyst notes that in a disaster, failover systems must be up and running…
OR